PUTZMEISTER
PUTZMEISTER BRAZIL
PRO-TECH
SHOTCRETE
PIPE
COMPLETE CONCRETE PLACING SYSTEMS AND SUPPORT
Press Releases
Job Stories
High Profile Projects
Archive
Events Calendar
Putz Post
Advantage:
News
› High Profile Projects › May 2013
High Profile Projects May 2013
Boom Pumps
Creating the Foundation for Cleaner Energy
We Will Never Forget...
Going Global for the Panama Canal
In the Wet
Flying High
World’s Largest Concrete Boom Pump Reaches Success on Historic Project
Bringing Back the Sparkle to Old Hollywood
Taum Sauk Dam Rebuild Looks to Roller-Compacted Concrete
Pumping Up the Electricity and the Concrete Volume
Telebelts
We Will Never Forget...
Going Global for the Panama Canal
Taum Sauk Dam Rebuild Looks to Roller-Compacted Concrete
Putzmeister Telebelt® TB 110 Conveys Success for Con Edison, Inc. Substation
Pumping Up the Electricity and the Concrete Volume
MGM Residence Towers Bets on Success of Pervious Concrete
Big Bridge, Big Equipment: Contractors Rely on Putzmeister America Equipment to Construct the Tacoma Narrows Bridge
Separate Placing Booms
Creating the Foundation for Cleaner Energy
In the Wet
Protecting New Orleans From Future Storm Devastation
Flying High
The Making of a Modern Marvel
“World’s Largest Offshore Caisson Breakwater”
Bringing Back the Sparkle to Old Hollywood
Putzmeister Pump Breaks Another World Record at Burj Dubai
Putzmeister Pump Breaks World Record at Burj Dubai
New Tower Trumps Others as the Tallest Reinforced Concrete Structure in North America
Power Plant Construction Needs Powerful Equipment
Large Line
Creating the Foundation for Cleaner Energy
In the Wet
Protecting New Orleans From Future Storm Devastation
Flying High
The Making of a Modern Marvel
“World’s Largest Offshore Caisson Breakwater”
Putzmeister Pump Breaks Another World Record at Burj Dubai
Putzmeister Pump Breaks World Record at Burj Dubai
New Tower Trumps Others as the Tallest Reinforced Concrete Structure in North America
Power Plant Construction Needs Powerful Equipment
Big Bridge, Big Equipment: Contractors Rely on Putzmeister America Equipment to Construct the Tacoma Narrows Bridge
Thom-Katts
Going Global for the Panama Canal
Pumping Up the Electricity and the Concrete Volume
Home
|
News
|
Products
|
Used Equipment
|
Support
|
About Us
|
Employment
|
Merchandise
Search
E-mail Signup
Contact Us
Putzmeister America, Inc.
1733 90th Street, Sturtevant, WI 53177
Phone: (262) 886-3200 • Fax: (262) 884-6338 • Toll Free: (800) 884-7210
© 2013 Putzmeister America, Inc. All rights reserved.
Privacy Statement